| Bid No. |
Title |
Award Date |
Expiration Date |
Renewal Options |
Buyer |
Vendor |
Amount |
| Fiscal Year 12 |
| JCF-0041-12 |
A/C AND OUTSIDE AHU REPLACEMENT AT MAXVILLE LIBRARY (JSEB SET-ASIDE). N/C |
3/6/2012 |
3/6/2013 |
0 |
BURNEY,A |
FLINT CONSTRUCTION SERVICES, INC. |
87,437.00 |
| CF-0004-12 |
ARGYLE FOREST BLVD & CHESWICK OAK AVE. INTERSECTION IMPROVEMENTS |
11/15/2011 |
11/15/2012 |
0 |
PEARSON,D |
CALLAWAY CONTRACTING COMPANY |
392,348.58 |
| JCF-0057-12 |
BEACH TILLING ALONG DUVAL COUNTY SHORELINE N/C (JSEB SET-ASIDE). |
3/19/2012 |
3/19/2013 |
0 |
BURNEY,A |
TLC TOTAL LAWNCARE |
26,875.00 |
| JCS-0385-12 |
BOARD-UP & GRAFFITI REMOVAL SVCS |
12/16/2011 |
9/30/2012 |
3 |
PEARSON,D |
JASON PHITIDES, INC. |
375,000.00 |
| |
|
|
|
|
|
CORE CONSTRUCTION COMPANY OF JACKSONVILLE |
25,000.00 |
| CS-0391-12 |
CECIL COMMERCE CENTER TIMBER SALE |
1/17/2012 |
1/16/2013 |
1 |
PEARSON,D |
J. CARTER TRUCKING |
416,165.60 |
| CF-0024-12 |
COMPLETE RENOVATION OF JACOBS JEWELERS SETH THOMAS CLOCK N/C |
3/7/2012 |
3/7/2013 |
0 |
BURNEY,A |
I. T.VERDIN COMPANY D/B/A THE VERDIN COMPANY |
51,094.00 |
| JCF-0040-12 |
CONSTRUCTION OF PAVILION AT THOMAS CREEK PRESERVE JSEB SET ASIDE - N/C |
3/8/2012 |
3/8/2013 |
0 |
BURNEY,A |
R. J. TRIPP, INC. D/B/A J. L. TRIPP BUILDERS |
35,900.00 |
| CF-0028-12 |
COOLING TOWER FILL REPLACEMENT AT PRE-TRIAL DETENTION FACILITY |
2/14/2012 |
2/14/2013 |
0 |
BURNEY,A |
W.W. GAY MECHANICAL CONTRACTORS |
49,725.00 |
| CP-0007-12 |
CRYSTAL SPRINGS ROAD-PHS 2A, CHAFFEE TO CAHOON |
1/31/2012 |
1/31/2013 |
0 |
PEARSON,D |
A.J. JOHNS, INC. |
564,227.15 |
| CF-0054-12 |
DEMOLITION & SITE CLEARANCE OF 15 PROPERTIES |
4/13/2012 |
9/30/2012 |
0 |
PEARSON,D |
BURKHALTER WRECKING |
2,270.00 |
| |
|
|
|
|
|
ARWOOD INC. |
4,325.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
14,096.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
13,450.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
12,590.00 |
| CF-0053-12 |
DEMOLITION & SITE CLEARANCE OF 17 PROPERTIES |
4/13/2012 |
4/13/2013 |
0 |
PEARSON,D |
MICHAEL LLOYD HAULING, INC. |
18,900.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
9,660.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
5,298.00 |
| |
|
|
|
|
|
ARWOOD INC. |
2,650.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
6,672.00 |
| CF-0025-12 |
DEMOLITION & SITE CLEARANCE OF 27 PROPERTIES |
2/14/2012 |
2/14/2013 |
0 |
PEARSON,D |
MICHAEL LLOYD HAULING, INC. |
37,500.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
6,554.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
37,505.00 |
| CF-0067-12 |
DEMOLITION & SITE CLEARANCE OF 7 F.E.M.A. PROPERTIES |
4/13/2012 |
4/13/2013 |
0 |
PEARSON,D |
P & G LANDCLEARING, INC. |
47,651.00 |
| CF-0030-12 |
DEMOLITION & SITE CLEARANCE OF F.E.M.A. PROPERTY LOCATED 6906 BAKERSFIELD DR |
1/5/2012 |
1/5/2013 |
0 |
PEARSON,D |
P & G LANDCLEARING, INC. |
6,991.00 |
| JCF-0061-12 |
DOOR REPLACEMENTS AT THREE (3) SWIMMING POOL LOCATIONS (SET ASIDE). $5.00 |
4/11/2012 |
4/11/2013 |
0 |
BURNEY,A |
BREAKING GROUND CONTRACTING, CO., |
25,100.00 |
| JCF-0021-12 |
EDWARD WATERS SUCCESS PARK: INSTALLATION OF PLAYGROUND EQUIPMENT (JSEB SET-ASIDE). |
1/3/2012 |
1/3/2013 |
0 |
BURNEY,A |
SOUTHERN AIRE CONTRACTING, INC. |
133,862.62 |
| JCF-0013-12 |
ELECTRICAL INSTALLATION FOR MOTORIZED WINDOWS AT WEST REGIONAL LIBRARY (JSEB SET-ASIDE). |
12/15/2011 |
9/30/2012 |
0 |
BURNEY,A |
THE ROSE GROUP, LLC |
4,400.00 |
| JCF-0006-12 |
EVE DRIVE WEST DRAINAGE IMPROVEMENTS |
10/28/2011 |
9/30/2012 |
0 |
KURTZ,S |
JB UNDERGROUND INC. |
86,146.95 |
| CS-0386-12 |
FENCE & RAIL MAINTENANCE AND CONSTRUCTION |
1/24/2012 |
9/30/2012 |
4 |
PEARSON,D |
NEWSOM FENCE COMPANY |
543,608.65 |
| JCF-0038-12 |
FT. CAROLINE ROAD EMBARKMENT STABILIZATION (JSEB SET-ASIDE). $25.00 |
3/22/2012 |
9/30/2012 |
0 |
KURTZ,S |
KADIN CORPORATION |
41,416.42 |
| JCF-0066-12 |
HUDNALL ROAD DRAINAGE IMPROVEMENT PROJECT (JSEB SET-ASIDE). $25.00 |
4/5/2012 |
4/5/2013 |
0 |
KURTZ,S |
KADIN CORPORATION |
43,422.49 |
| JCF-0044-12 |
INGLESIDE AVENUE ROADWAY IMPROVEMENT PROJECT (JSEB SET-ASIDE). $25.00 |
3/22/2012 |
9/30/2012 |
0 |
KURTZ,S |
KADIN CORPORATION |
79,050.80 |
| CF-0076-12 |
INSTALLATION OF POOL LIFTS AT VARIOUS SWIMMING POOL LOCATIONS |
4/30/2012 |
4/30/2013 |
0 |
BURNEY,A |
COMMERCIAL ENERGY SPECIALISTS |
89,925.00 |
| JCF-0050-12 |
INSTALLATION OF PLAYGROUND EQUIPMENT AT CARVER INTERNATIONAL PARK (JSEB SET-ASIDE). |
5/9/2012 |
9/30/2012 |
0 |
BURNEY,A |
ARKEST, LLC |
56,748.84 |
| CF-0029-12 |
INSTALLATION OF SECURITY CAMERA AT THREE JPL LOCATIONS |
3/19/2012 |
3/19/2013 |
0 |
BURNEY,A |
TNTSI INC. DBA SECURITY 101 |
38,825.82 |
| JCF-0008-12 |
J.S. JOHNSON SENIOR CENTER RENOVATIONS |
2/8/2012 |
2/8/2013 |
0 |
PEARSON,D |
FLINT CONSTRUCTION SERVICES, INC. |
161,000.00 |
| JCF-0069-12 |
JONES RD & CISCO DRIVE INTERSECTION IMPROVEMENT(JSEB SET-ASIDE). $25.00 |
5/4/2012 |
9/30/2012 |
0 |
KURTZ,S |
Aquino Construction Inc |
82,856.00 |
| JCF-0045-12 |
JOYNN ROAD DRAINAGE IMPROVEMENT (JSEB SET-ASIDE). $25.00 |
3/6/2012 |
9/30/2012 |
0 |
KURTZ,S |
SOUTHEAST STAINLESS FABRICATORS INC. |
38,796.00 |
| CF-0032-12 |
KERNAN BOULEVARD SCHOOL ZONE FLASHERS |
2/8/2012 |
2/8/2013 |
0 |
BURNEY,A |
AMERICAN LIGHTING AND SIGNALIZATION |
73,473.00 |
| JCF-0017-12 |
LENOX AVENUE BRIDGE IMPROVEMENTS (JSEB SET-ASIDE) |
2/14/2012 |
9/30/2012 |
0 |
KURTZ,S |
THE TOURING COMPANY, INC. |
99,964.28 |
| CF-0070-12 |
MAIN LIBRARY ADA RAMPS |
4/5/2012 |
4/5/2013 |
0 |
PEARSON,D |
AEJ PROPERTY SERVICES, LLC |
8,250.00 |
| CP-0027-12 |
PARCEL REMEDIATION FOR 5TH & CLEVELAND/FOREST ST. |
4/2/2012 |
4/2/2013 |
0 |
PEARSON,D |
ENTACT ENVIRONMENTAL SERVICES |
7,383,035.48 |
| CS-0261-12 |
PAVEMENT MARKINGS COUNTYWIDE |
1/31/2012 |
1/31/2013 |
2 |
PEARSON,D |
JAX UTILITIES MANAGEMENT |
802,475.00 |
| CF-0010-12 |
PLAYGROUND EQUIPMENT AT HOLLYBROOK PARK |
1/3/2012 |
1/3/2013 |
0 |
BURNEY,A |
BLISS PRODUCTS & SERVICES, INC. |
42,377.53 |
| CS-0365-12 |
POOL RENOVATIONS |
2/9/2012 |
9/30/2012 |
4 |
PEARSON,D |
BACKYARD DESIGNS, INC. |
2,911,670.40 |
| CF-0046-12 |
PRECAST LIGHT LOCKERS FOR SPORTS LIGHTING CONTROL SYSTEMS N/C FED FUND. |
3/7/2012 |
3/7/2013 |
0 |
PEARSON,D |
M GAY CONSTRUCTORS |
66,700.00 |
| JCF-0082-12 |
PROSPECT STREET DRAINAGE IMPROVEMENT PROJECT (JSEB SET-ASIDE). $25.00 |
5/11/2012 |
9/30/2013 |
0 |
KURTZ,S |
KADIN CORPORATION |
27,505.00 |
| JCF-0036-12 |
REPLACE & INSTALL PLAYGROUND EQUIPMENT AT 5 PARKS |
2/14/2012 |
2/14/2013 |
0 |
PEARSON,D |
SOUTHERN AIRE CONTRACTING, INC. |
198,500.00 |
| JCF-0019-12 |
REPLACEMENT OF TILE FLOORING IN PRETRIAL DETENTION FACILITY KITCHEN (JSEB SET-ASIDE). |
2/1/2012 |
2/1/2013 |
0 |
BURNEY,A |
LYNN LEE CONSTRUCTION GROUP |
11,670.00 |
| CDB-0001-12 |
ROOF REPLACE & WATER INTRUSION MITIGATION FOR BRADHAM BROOK LIBRARY (PQ:CDB-0417-11) |
1/31/2012 |
1/31/2013 |
0 |
PEARSON,D |
ACON CONSTRUCTION COMPANY, INC. |
780,000.00 |
| JCF-0023-12 |
SAM ROAD EROSION CONTROL PROJECT (JSEB SET-ASIDE) |
2/14/2012 |
9/30/2012 |
0 |
BURNEY,A |
JB UNDERGROUND INC. |
18,128.52 |
| JCF-0051-12 |
SEMINOLE ROAD READWAY IMPROVEMENTS |
4/5/2012 |
9/30/2012 |
0 |
KURTZ,S |
Aquino Construction Inc |
136,120.00 |
| CS-0295-12 |
SPORTS COURT MAINTENANCE & CONSTRUCTION |
11/15/2011 |
9/30/2012 |
2 |
PEARSON,D |
COURT SURFACES INC. |
198,860.50 |
| CF-0035-12 |
SPORTS LIGHTING CONTROL SYSTEMS AT VARIOUS PARKS |
3/23/2012 |
3/23/2013 |
0 |
PEARSON,D |
M GAY CONSTRUCTORS |
353,100.00 |
| CS-0503-12 |
STORM SEWER CLEANING & CCTV INSPECTIONS |
5/2/2012 |
9/30/2012 |
4 |
PEARSON,D |
ALTAIR ENVIRONMENTAL GROUP LLC |
267,349.00 |
| CS-0480-12 |
TRAFFIC SIGNAL CONSTRUCTION COUNTYWIDE |
4/13/2012 |
4/13/2013 |
2 |
PEARSON,D |
James D Hinson Electrical Contracting Company Inc |
400,000.00 |
| |
|
|
|
|
|
MILLER ELECTRIC CO. |
200,000.00 |
| CF-0022-12 |
UF SHANDS HOSPITAL BOMB BLAST MITIGATION-PHS 2 $N/C |
1/24/2012 |
1/24/2013 |
0 |
PEARSON,D |
MID-ATLANTIC SERVICE & SUPPLY CORP. |
62,088.00 |
| JCF-0060-12 |
UPGRADE TO ENERGY MANAGEMENT SYSTEMS AT NINE (9) CITY LOCATIONS (SET ASIDE). |
4/19/2012 |
4/19/2013 |
0 |
BURNEY,A |
LYNN LEE CONSTRUCTION GROUP |
35,600.00 |
| JCF-0064-12 |
UPGRADE TO GREEN FIELD LIGHTING AT BOONE & NORMANDY PARKS |
4/13/2012 |
4/13/2013 |
0 |
PEARSON,D |
J L TRIPP BUILDERS, INC. |
309,000.00 |
| CF-0049-12 |
UPGRADE TO LOCKS AND HARDWARE AT TWO PUBLIC LIBRARY BRANCHES N/C (FED-FUNDING). |
3/22/2012 |
3/22/2013 |
0 |
BURNEY,A |
STANLEY SECURITY SOLUTIONS |
25,476.84 |
| CF-0018-12 |
VIDEO BOARD ENHANCEMENT FOR VETERANS MEMORIAL ARENA |
2/14/2012 |
2/14/2013 |
0 |
PEARSON,D |
DAKTRONICS, INC. |
1,035,358.93 |
| CP-0033-12 |
WATER STREET PARKING GARAGE RENOVATIONS |
3/9/2012 |
3/9/2013 |
0 |
PEARSON,D |
WORTH CONTRACTING |
866,283.00 |
| JCF-0043-12 |
WATERPROOFING AT JACKSONVILLE CHILDREN'S COMMISION (JSEB SET-ASIDE). N/C |
4/11/2012 |
4/11/2013 |
0 |
BURNEY,A |
JL TRIPP BUILDERS |
21,400.00 |
| Fiscal Year 11 |
| CS-0229-11 |
ANNUAL PLUMBING REPAIRS SERVICE CONTRACT |
12/3/2010 |
12/3/2012 |
2 |
PEARSON,D |
ASAP PLUMBING & DRAIN COMPANY |
100,500.00 |
| CF-0097-11 |
BAYVIEW COMMUNICATION TOWER REPLACEMENT N/C |
5/27/2011 |
5/27/2012 |
0 |
PEARSON,D |
TOWER SYSTEM SOUTH, INC. |
187,987.09 |
| JCF-0127-11 |
BEAVER STREET DRAINAGE IMPROVEMENTS (JSEB SET-ASIDE). $50.00 |
8/11/2011 |
9/30/2012 |
0 |
KURTZ,S |
THE ROSE GROUP, LLC |
74,444.25 |
| JCF-0134-11 |
BLANCHARD ROAD DRAINAGE IMPROVEMENT PROJECT(JSEB SET-ASIDE). $25.00 |
8/26/2011 |
5/19/2012 |
0 |
KURTZ,S |
KADIN CORPORATION |
44,911.88 |
| JCF-0155-11 |
BRANDEMERE ROAD SOUTH BRIDGE REPLACEMENT $25.00 (JSEB SET-ASIDE). |
10/7/2011 |
9/30/2012 |
0 |
KURTZ,S |
KADIN CORPORATION |
165,065.78 |
| JCF-0154-11 |
BROADWAY AVENUE ROADWAY IMPROVEMENTS $25 (JSEB SET-ASIDE). |
10/13/2011 |
6/1/2012 |
0 |
KURTZ,S |
KIRBY DEVELOPMENT INC. |
69,341.03 |
| CF-0128-11 |
CHILLER REPLACEMENT AT JFRD EMERGENCY OPERATIONAL CENTER |
10/10/2011 |
9/30/2012 |
0 |
BURNEY,A |
SOUTHERN AIRE CONTRACTING, INC. |
85,186.90 |
| CF-0078-11 |
CITY HALL BASEMENT STRUCTURE REPAIRS |
6/24/2011 |
11/30/2012 |
0 |
PEARSON,D |
HALBERT CONTRACTING , INC. |
132,021.00 |
| CP-0121-11 |
CONSTRUCTION OF POND AT POWERS AVENUE |
8/30/2011 |
8/30/2012 |
0 |
PEARSON,D |
CHAPMAN CONSTRUCTION - N-T-E $366,583.78 |
366,583.78 |
| CP-0100-11 |
CONTINUOUS ASPHALT RESURFACING-SOUTH & EAST AREAS |
8/30/2011 |
9/30/2012 |
2 |
PEARSON,D |
HUBBARD CONSTRUCTION COMPANY |
3,000,000.00 |
| |
|
|
|
|
|
HUBBARD CONSTRUCTION COMPANY |
3,000,000.00 |
| CF-0107-11 |
COOLING TOWER REPLACEMENT AT DUVAL COUNTY HEALTH DEPARTMENT (N/C). |
9/15/2011 |
9/30/2012 |
0 |
BURNEY,A |
JOHNSON CONTROLS |
89,950.00 |
| JCF-0131-11 |
COUNTYWIDE CONCRETE MAINTENANCE & CONSTRUCTION-S, N, & W AREAS |
9/28/2011 |
9/30/2012 |
2 |
PEARSON,D |
UNITED SERVICE CONNECTION |
483,020.00 |
| |
|
|
|
|
|
JB UNDERGROUND INC. |
967,692.00 |
| CP-0110-11 |
COUNTYWIDE HARDSCAPE MAINTENANCE & CONSTRUCTION |
6/30/2011 |
9/30/2012 |
2 |
PEARSON,D |
UNITED SERVICE CONNECTION |
672,550.00 |
| JCF-0150-11 |
COUNTYWIDE STREET SWEEPING INSPECTION SERVICES N/C (JSEB SET-ASIDE). |
10/7/2011 |
9/30/2012 |
0 |
BURNEY,A |
QUALITY TRUST INVESTMENTS, INC. |
26,000.00 |
| CF-0108-11 |
DEMOLITION & SITE CLEARANCE OF 12 CONDEMNED PROPERTIES |
6/30/2011 |
6/30/2012 |
0 |
PEARSON,D |
MICHAEL LLOYD HAULING, INC. |
13,025.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
5,974.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
20,704.00 |
| CF-0085-11 |
DEMOLITION & SITE CLEARANCE OF 17 PROPERTIES |
6/30/2011 |
6/30/2012 |
0 |
PEARSON,D |
HAROLD'S LAND CLEARING |
22,961.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
2,600.00 |
| |
|
|
|
|
|
MICHAEL LLOYD HAULING, INC. |
18,200.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
20,080.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
4,761.00 |
| CF-0083-11 |
DEMOLITION & SITE CLEARANCE OF 21 PROPERTIES |
6/6/2011 |
6/6/2012 |
0 |
PEARSON,D |
ARWOOD INC. |
2,925.00 |
| |
|
|
|
|
|
MICHAEL LLOYD HAULING, INC. |
29,575.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
23,490.00 |
| CF-0146-11 |
DEMOLITION & SITE CLEARANCE OF 22 PROPERTIES |
11/1/2011 |
11/1/2012 |
0 |
PEARSON,D |
JAGUAR DEMOLITION & SITE CLEARING |
21,233.00 |
| |
|
|
|
|
|
MICHAEL LLOYD HAULING, INC. |
8,425.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
27,372.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
18,894.00 |
| CF-0084-11 |
DEMOLITION & SITE CLEARANCE OF 3 FEMA PROPERTIES |
6/6/2011 |
6/6/2012 |
0 |
PEARSON,D |
P & G LANDCLEARING, INC. |
17,866.00 |
| CF-0147-11 |
DEMOLITION & SITE CLEARANCE OF 43 PROPERTIES |
11/1/2011 |
9/30/2012 |
0 |
PEARSON,D |
PINE GROVE DAIRY, INC. D/B/A ROSS & LOGIN DISPOSAL |
3,200.00 |
| |
|
|
|
|
|
P & G LANDCLEARING, INC. |
17,635.00 |
| |
|
|
|
|
|
MICHAEL LLOYD HAULING, INC. |
13,175.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
27,390.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
59,319.00 |
| |
|
|
|
|
|
ARWOOD INC. |
6,100.00 |
| |
|
|
|
|
|
LOCKWOOD QUALITY DEMOLITION |
7,700.00 |
| CF-0054-11 |
DEMOLITION & SITE CLEARANCE OF 44 PROPERTIES |
4/1/2011 |
9/30/2012 |
0 |
PEARSON,D |
P & G LANDCLEARING, INC. |
32,498.00 |
| |
|
|
|
|
|
ARWOOD INC. |
8,600.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
28,637.00 |
| |
|
|
|
|
|
JAGUAR DEMOLITION & SITE CLEARING |
7,000.00 |
| |
|
|
|
|
|
TURNKEY CONST. |
18,675.00 |
| |
|
|
|
|
|
D.H. GRIFFIN WRECKING CO. |
44,743.00 |
| CF-0124-11 |
DEMOLITION OF TOWNHOME LOCATED 2107 DUNES WAY DRIVE EAST |
7/25/2011 |
7/25/2012 |
0 |
PEARSON,D |
AMELLA JEWELL, INC. |
22,500.00 |
| CDB-0417-11 |
DESIGN-BUILD RFQ FOR CITY/COUNTY WIDE CONSTRUCTION IMPROVEMENT PROJECTS-HUD/DISASTER ASST. |
5/31/2011 |
5/31/2013 |
1 |
PEARSON,D |
BREAKING GROUND CONTRACTING, CO., |
|
| |
|
|
|
|
|
Petticoat -Schmitt Civil Contractors, Inc. |
|
| |
|
|
|
|
|
ACON CONSTRUCTION COMPANY, INC. |
|
| |
|
|
|
|
|
THE ROSE GROUP, LLC |
|
| |
|
|
|
|
|
CALLAWAY CONTRACTING COMPANY |
|
| JCF-0148-11 |
EASTPORT ROAD DRAINAGE IMPROVEMENT |
9/30/2011 |
9/30/2012 |
0 |
KURTZ,S |
KIRBY DEVELOPMENT INC. |
107,912.59 |
| |
|
|
|
|
|
KADIN CORPORATION |
|
| CP-0142-11 |
ED BALL 1ST, 5TH, 6TH, & BASEMENT RENOVATIONS |
10/18/2011 |
12/30/2012 |
0 |
PEARSON,D |
BREAKING GROUND CONTRACTING, CO., |
1,315,077.00 |
| CS-0566-11 |
ELEVATOR FIRE SERVICE UPGRADES AT 4 PUBLIC BLDGS |
11/15/2011 |
11/15/2012 |
0 |
PEARSON,D |
COASTAL ELEVATOR SERVICE CORPORATION |
222,840.00 |
| CS-0138-11 |
EMERGENCY TRAFFIC SIGNAL REPAIR |
12/12/2011 |
9/30/2012 |
2 |
PEARSON,D |
James D Hinson Electrical Contracting Company Inc |
|
| |
|
|
|
|
|
AMERICAN LIGHTING AND SIGNALIZATION |
|
| CF-0074-11 |
HANNA PARK ELECTRICAL RE-BUILD |
6/20/2011 |
6/20/2012 |
0 |
PEARSON,D |
THOMPSON ELECTRIC |
799,762.00 |
| CF-0089-11 |
LAKE FRETWELL EXPANSION-PHS 1 |
6/30/2011 |
6/30/2012 |
0 |
PEARSON,D |
HAGER CONSTRUCTION COMPANY |
990,170.81 |
| JCF-0058-11 |
LEAFY LANE DRAINAGE IMPROVEMENT PROJECT (JSEB SET-ASIDE). |
3/31/2011 |
5/24/2012 |
0 |
KURTZ,S |
Pars Construction Services LLC |
44,000.00 |
| CP-0042-11 |
LINCOLN VILLAS DRAINAGE IMPROVEMENTS-WEST |
6/20/2011 |
10/4/2012 |
0 |
PEARSON,D |
CALLAWAY CONTRACTING COMPANY |
1,150,000.00 |
| CP-0065-11 |
MARY LENA GIBBS COMMUNITY CENTER RENOVATIONS |
4/22/2011 |
8/27/2012 |
0 |
PEARSON,D |
Pars Construction Services LLC |
352,000.00 |
| CF-0112-11 |
MCCOY'S CREEK POND "D" MODIFICATIONS |
8/30/2011 |
8/30/2012 |
0 |
PEARSON,D |
CALLAWAY CONTRACTING COMPANY |
250,224.05 |
| CP-0143-11 |
MCCOY'S CREEK PONDS-BURKE/CHEROKEE SITE(REBID) |
12/12/2011 |
12/12/2012 |
0 |
PEARSON,D |
CALLAWAY CONTRACTING COMPANY |
4,173,366.80 |
| JCF-0132-11 |
MURRAY HILL PARK DUGOUT REPLACEMENT (JSEB SET-ASIDE). |
9/22/2011 |
8/22/2012 |
0 |
BURNEY,A |
AQUINO CONSTRUCTION, INC. |
101,500.00 |
| CP-0115-11 |
NEW BERLIN & YELLOW BLUFF ROADWAY IMPROVEMENTS |
9/28/2011 |
9/28/2012 |
0 |
PEARSON,D |
Petticoat -Schmitt Civil Contractors, Inc. |
669,512.30 |
| BXX-1002-11 |
NEW TELEPHONE SYSTEM FOR THE PUBLIC DEFENDER'S OFFICE |
9/28/2011 |
9/30/2012 |
0 |
LAIDLER,M |
PRESIDIO NETWORKED SOLUTIONS, INC. |
146,926.03 |
| JCF-0093-11 |
NORMEDS ROAD CUL-DE-SAC CONSTRUCTION (JSEB SET-ASIDE) - $25.00 |
6/1/2011 |
6/1/2012 |
0 |
KURTZ,S |
JB UNDERGROUND INC. |
69,037.68 |
| CF-0060-11 |
PARKING LOT MAINTENANCE STRIPING & MARKINGS |
5/9/2011 |
5/9/2013 |
1 |
PEARSON,D |
THE STRIPE ZONE, INC. |
75,000.00 |
| CP-0117-11 |
PEDESTRIAN SAFETY IMPROVEMENT PROGRAM-WEST (SIDEWALKS) |
10/1/2011 |
9/30/2012 |
2 |
PEARSON,D |
UNITED SERVICE CONNECTION, INC. |
750,000.00 |
| CDB-0129-11 |
RENOVATION OF THE LINCOLN VILLA SENIOR CENTER |
1/31/2012 |
1/31/2013 |
0 |
PEARSON,D |
ACON CONSTRUCTION COMPANY, INC. |
567,100.00 |
| JCF-0153-11 |
REPAIR FIRE DAMAGED AT RAILS-TO-TRAILS RESTROOM FACILITY (JSEB SET-ASIDE). |
11/16/2011 |
9/30/2012 |
0 |
BURNEY,A |
WORLD CONSTRUCTION CO., INC |
6,800.00 |
| CF-0070-11 |
REPLACEMENT OF SEPTIC SYSTEM AT FIRE STATION #49 |
6/1/2011 |
9/30/2012 |
0 |
BURNEY,A |
A-1 WASTE MANAGEMENT, INC. |
23,249.00 |
| CF-0145-11 |
REPLACEMENT OF WINDOWS AT PRETRIAL DETENTION FACILITY N/C |
10/10/2011 |
9/30/2012 |
0 |
BURNEY,A |
DUVAL GLASS & MIRROR, INC. |
89,900.00 |
| CF-0136-11 |
RE-ROOF & WATER INTRUSION MITIGATION FOR S.E. REGIONAL LIBRARY |
9/28/2011 |
9/28/2012 |
0 |
PEARSON,D |
R B GAY CONSTRUCTION |
288,900.00 |
| JCF-0139-11 |
RESTROOM RENOVATION AT CONFEDERATE PARK (JSEB SET-ASIDE). NO CHARGE. |
1/3/2012 |
1/3/2013 |
0 |
BURNEY,A |
SYNOT CONSTRUCTION |
50,000.00 |
| CS-0547-11 |
ROOF REPAIRS MAINTENANCE & SERVICES |
1/17/2012 |
9/30/2012 |
4 |
PEARSON,D |
McCURDY WALDEN, INC. |
156,000.00 |
| JCF-0149-11 |
ROOF REPLACEMENT FOR NINE (9) BUILDINGS AT HANNA PARK JAX SMALL BUSINESS SET-ASIDE. |
12/5/2011 |
9/30/2012 |
0 |
BURNEY,A |
FLINT CONSTRUCTION SERVICES, INC. |
65,928.00 |
| JCF-0044-11 |
SANDUSKY AVENUE SOUTH DITCH IMPROVEMENTS (JSEB SET-ASIDE). $50.00 |
2/7/2011 |
7/13/2012 |
0 |
KURTZ,S |
THE TOURING COMPANY, INC. |
64,531.28 |
| CP-0111-11 |
SHEFFIELD REGIONAL PARK-PHS I-REBID |
8/12/2011 |
5/1/2013 |
0 |
PEARSON,D |
C. C. BORDEN CONSTRUCTION |
4,238,898.00 |
| CF-0130-11 |
S-LINE URBAN GREENWAY-PHS II |
9/28/2011 |
9/28/2012 |
0 |
PEARSON,D |
JACKSONVILLE EIGHTEEN CONSTRUCTION INC |
502,397.25 |
| CF-0113-11 |
SWIMMING POOL MODIFICATIONS AT SUNNY ACRES (N/C). |
7/27/2011 |
9/30/2012 |
0 |
BURNEY,A |
VILLAGE POOLS OF CENTRAL FLORIDA, LLC |
19,200.00 |
| JCF-0068-11 |
TOM MARSHALL PARK IMPROVEMENTS $50.00 (JSEB SET-ASIDE). |
5/24/2011 |
6/24/2012 |
0 |
BURNEY,A |
J L TRIPP BUILDERS, INC. |
52,428.00 |
| JCF-0123-11 |
TOWNSEND BLVD DRAINAGE PROJECT(JSEB SET-ASIDE) $25.00 |
8/22/2011 |
9/30/2012 |
0 |
KURTZ,S |
KIRBY DEVELOPMENT INC. |
82,433.03 |
| CP-0119-11 |
TRAIL RIDGE BORROW PIT ACCESS DRIVE |
8/30/2011 |
8/30/2012 |
0 |
PEARSON,D |
W.R. TOWNSEND CONSTRUCTION, INC. |
367,076.00 |
| CP-0073-11 |
TRAIL RIDGE LANDFILL INCREMENTAL CLOSURE-PHS III |
7/8/2011 |
7/8/2012 |
0 |
PEARSON,D |
ERC GENERAL CONTRACTING SVCS, INC. |
3,144,024.00 |
| JCF-0098-11 |
TRAILRIDGE BORROW SITE FENCE (JSEB SET-ASIDE) N/C |
6/24/2011 |
6/24/2012 |
0 |
PEARSON,D |
THE ROSE GROUP, LLC |
97,500.00 |
| JCF-0122-11 |
UNIVERSITY BLVD DRAINAGE IMPROVEMENT PROJECT (JSEB SET-ASIDE). $25.00 |
8/11/2011 |
5/19/2012 |
0 |
KURTZ,S |
KADIN CORPORATION |
79,240.19 |
| JCF-0133-11 |
VICTORIA PARK PAVILION RENOVATION (JSEB SET-ASIDE). |
12/1/2011 |
9/30/2012 |
0 |
BURNEY,A |
MATTHIS CONSTRUCTION |
10,800.00 |
| CF-0088-11 |
WETLAND MITIGATION/CREATION AT CECIL COMMERCE CTR-REBID |
6/30/2011 |
6/30/2012 |
0 |
PEARSON,D |
HAYWARD CONSTRUCTION GROUP, LLC. |
622,750.00 |
| CF-0137-11 |
WIND RETRO-FIT HAZARD MITIGATION FOR 5 PUBLIC BLDGS |
1/17/2012 |
1/17/2013 |
0 |
PEARSON,D |
HURRICANE PROTECTION INDUSTRIES LLC |
195,200.00 |
| |
|
|
|
|
|
ATLANTIC COAST HURRICANE SHUTTERS, INC. |
185,989.38 |
| JCF-0156-11 |
WOODRUFF AVENUE PEDESTRIAN BRIDGE DEMOLITION (JSEB SET-ASIDE) $25.00 |
10/25/2011 |
9/30/2012 |
0 |
KURTZ,S |
KADIN CORPORATION |
94,350.45 |
| Fiscal Year 10 |
| CS-0573-10 |
ANNUAL DOCK MAINTENANCE |
12/20/2010 |
9/30/2012 |
2 |
PEARSON,D |
C & L LANDSCAPE |
400,000.00 |
| CS-0114-10 |
ASPHALT PAVEMENT REJUVENATION COUNTY-WIDE |
10/8/2010 |
9/30/2012 |
1 |
PEARSON,D |
PAVEMENT TECHNOLOGY, INC. |
400,000.00 |
| JCF-0522-10 |
BROADWAY AVENUE CULVERT REPLACEMENTS |
7/21/2010 |
6/9/2012 |
0 |
KURTZ,S |
UNITED CONNECTION, INC. |
158,267.20 |
| CP-0009-10 |
CONTINUING ASPHALT RESURFACING NORTH AND WEST AREA FOR DUVAL COUNTY |
11/20/2009 |
9/30/2012 |
0 |
ARNETT,M |
DUVAL ASPHALT PRODUCTS, INC |
6,000,000.00 |
| |
|
|
|
|
|
APAC - SOUTHEAST INC |
6,000,000.00 |
| CP-0012-10 |
CONTINUOUS DRAINLINE REPLACEMENT AND/OR NEW DRAINLINE CONSTRUCTION |
11/20/2009 |
9/30/2012 |
0 |
PEARSON,D |
JAX UTILITIES MANAGEMENT |
1,688,765.00 |
| CP-0116-10 |
CONTINUOUS STORM SEWER CAVE-IN REPAIR |
9/8/2010 |
9/30/2012 |
2 |
PEARSON,D |
JAX UTILITIES CONSTRUCTION |
3,431,286.16 |
| CS-0136-10 |
COUNTYWIDE STREET SWEEPING |
9/30/2010 |
9/30/2012 |
3 |
PEARSON,D |
U.S.A. SERVICES OF FLORIDA, INC. |
304,879.70 |
| CF-0047-10 |
DEMOLITION & SITE CLEARANCE OF 41 PROPERTIES |
5/10/2010 |
9/30/2012 |
0 |
PEARSON,D |
PINE GROVE DAIRY, INC. D/B/A ROSS & LOGIN DISPOSAL |
5,321.00 |
| |
|
|
|
|
|
ROSS & LOGAN INDUSTRIES, INC. |
12,150.00 |
| |
|
|
|
|
|
DON BELL, INC. |
2,635.00 |
| |
|
|
|
|
|
HAROLD'S LAND CLEARING |
89,329.00 |
| |
|
|
|
|
|
MICHAEL LLOYD HAULING, INC. |
18,333.00 |
| |
|
|
|
|
|
STRICKLAND'S TRACTOR |
6,050.00 |
| CF-0071-10 |
DEMOLITION & SITE CLEARANCE OF 44 PROPERTIES |
6/4/2010 |
9/30/2012 |
0 |
PEARSON,D |
HAROLD'S LAND CLEARING |
53,669.00 |
| |
|
|
|
|
|
MICHAEL LLOYD HAULING, INC. |
87,248.00 |
| |
|
|
|
|
|
DON BELL, INC. |
|
| |
|
|
|
|
|
C & L LANDSCAPE, INC. |
11,500.00 |
| |
|
|
|
|
|
ARWOOD, INC. |
17,825.00 |
| CS-0099-10 |
HAZARD TREE SERVICES |
8/16/2010 |
9/30/2012 |
2 |
PEARSON,D |
LEWIS TREE SERVICE INC. |
327,356.75 |
| JCF-0029-10 |
IMESON RD BIKE TRAIL RESTROOM |
1/21/2010 |
6/28/2012 |
0 |
PEARSON,D |
DEVELOPMENT SOLUTIONS, LLC. |
|
| |
|
|
|
|
|
DAJIS CONSTRUCTION, INC. |
103,690.40 |
| CS-0075-10 |
RECREATIONAL SITE AGRONOMIC SERVICES |
7/2/2010 |
9/30/2012 |
1 |
PEARSON,D |
MCCALL SERVICE, INC. |
172,660.85 |
| CS-0559-10 |
SEPTIC TANK, LIFT STATION PUMP-OUT SERVICE |
9/17/2010 |
9/30/2012 |
1 |
PEARSON,D |
A-1 WASTE MANAGEMENT, INC. |
53,820.00 |
| CS-0076-10 |
VEGETATION MANAGEMENT COUNTY-WIDE |
7/2/2010 |
9/30/2012 |
1 |
PEARSON,D |
DEANGELO BROTHERS, INC. |
100,104.70 |
| |
|
|
|
|
|
PESTMASTER SERVICE, INC. |
85,002.18 |
| CF-0083-10 |
WATER TAXI STATION AT FT GEORGE RIVER |
8/27/2010 |
9/30/2012 |
0 |
PEARSON,D |
SHORELINE FOUNDATION, INC. |
477,388.30 |
| Fiscal Year 09 |
| CDB-0049-09 |
DESIGN BUILD SERVICES FOR VARIOUS MINOR-MEDIUM SIZE CIVIL/ PARKS |
5/15/2009 |
5/14/2013 |
2 |
PEARSON,D |
J B COXWELL CONTRACTING |
|
| |
|
|
|
|
|
CALLAWAY CONTRACTING COMPANY |
|
| |
|
|
|
|
|
AULD & WHITE CONSTRUCTORS |
|
| CDB-0037-09 |
DESIGN/ BUILD CONSTRUCTION OF FOUR NEW FIRE STATIONS # 26, 40, 61, 62 POC: J. HUBERT 255-8 |
6/1/2009 |
9/30/2012 |
0 |
PEARSON,D |
ACON CONSTRUCTION COMPANY, INC. |
|
| |
|
|
|
|
|
THE HASKELL COMPANY |
|
| |
|
|
|
|
|
AULD & WHITE CONSTRUCTORS |
4,063,778.28 |
| CS-0542-09 |
JACKSONVILLE MUNICIPAL STADIUM TEMPORARY SEATING SYSTEM PROJECT |
10/1/2009 |
9/30/2012 |
1 |
DUBBERLY,J |
SGA HOLDINGS, INC DBA SGA PRODUCTION STAGING |
269,379.00 |
| JCS-0113-09 |
PEDESTRIAN SAFETY IMPROVEMENT PROGRAM-N & S |
9/25/2009 |
9/30/2012 |
0 |
PEARSON,D |
Overstreet & Associates Inc |
500,000.00 |
| |
|
|
|
|
|
Overstreet & Associates Inc |
500,000.00 |
| |
|
|
|
|
|
C.A.P. CONTRACTING, INC. |
500,000.00 |
| |
|
|
|
|
|
THE TOURING COMPANY, INC. |
500,000.00 |
| Fiscal Year 08 |
| CP-0012-08 |
BAY STREET BRIDGE EXPANSION OVER HOGANS CREEK |
1/10/2008 |
8/29/2012 |
0 |
ARNETT,M |
LUCAS MARINE CONSTRUCTION, LLC |
2,858,373.40 |
| BCP-1001-08 |
DITCH CLEANING/REHABILITATION COUNTYWIDE NORTH AND SOUTH AREAS |
12/3/2007 |
9/30/2013 |
0 |
KURTZ,S |
JAX UTILITIES MANAGEMENT |
1,200,000.00 |
| Fiscal Year 07 |
| BCS-0021-07 |
PREQUALIFICATIONS FOR CURED-IN-PLACE PIPE |
9/29/2008 |
9/30/2012 |
0 |
KURTZ,S |
LANZO LINING SERVICES INC |
1,000,000.00 |
| |
|
|
|
|
|
INSITUFORM TECHNOLOGIES, INC |
253,210.00 |
| |
|
|
|
|
|
AMERICAN WATER SRVCS UNDERGRND INFRASTRUCTURE INC |
1,000,000.00 |
| |
|
|
|
|
|
INSITUFORM TECHNOLOGIES, INC |
1,000,000.00 |
|